Wilton Makmur Indonesia SQMI

 





Listed on the Development Board of the Indonesia Exchange, Wilton Makmur Indonesia Tbk (“Wilton” or the “Company”, and together with its subsidiaries, the “Group”), is engaged in the exploration and mining of gold, and production of gold dore in Indonesia, a major gold producing country.

Rich in ore reserves and mineral resources, the Group’s Ciemas Gold Project, covering a total area of 3,078.5 hectares, is located in West Java, Indonesia. In the latest Independent Qualified Person’s Report (“IQPR”)1, it is estimated that the Ciemas Gold Project contains approximately 3,260 kt of ore reserves with an average grade of approximately 7.7 g/t of gold2.

In terms of mineral resources, it is estimated that the Ciemas Gold Project has approximately 3,415 kt of measured and indicated mineral resources and 2,559 kt of inferred mineral resources, with an average grade of approximately 8.6 g/t and 6.5 g/t of gold2, respectively.

Barring unforeseen circumstances, the Group is on track to commence commercial production of gold at its 500 tonnes per day Flotation and Carbon-In-Leach mineral processing plant by end of FY2019 (i.e. by June 2019).

Besides seeking to develop gold deposits, the Group is exploring the potential of other mineralised areas of the Ciemas Gold Project to build sustainable value for its stakeholders.


IQPR dated 30 September 2018 was prepared by independent consultant, SRK Consulting (China) Ltd. (“SRK”)
In accordance with the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the “JORC Code 2012 Edition”)  Wilton Makmur Indonesia SQMI


VISION
To be an accomplished Gold Mining Group in Asia

MISSION
We are committed to provide sustainable value to our stakeholders and be socially responsible

CORE VALUES

PLEDGE OF PARTNERSHIP

We adopt a “Partnership” approach to achieve a “win-win” situation in all relationships
SENSE OF CONVICTION

Our passion and sense of conviction in our business inspires us to deliver our goals  Wilton Makmur Indonesia




Sustainability


Environmental Protection
On 22 October 2013, the company has been awarded “Clean and Clear” certificate by the Directorate General of Minerals and Coal. This certifies that the company has fully complied to the relevant Indonesian environmental and mining laws & regulations in conducting the mining operations.

Corporate Social Responsibility (“CSR”)
The Group has developed good working relationship, and has engaged, supported and provided employment for the local community. This invariably also improves the living standard of the community.

Through the CSR program, the Group has improved the infrastructure in the vicinity of the Concession Blocks, such as constructing public recreational facilities for the local community.

These cordial working relationships with the local community achieved through carrying out the mining activities responsibly would optimise the efficiency of the mining operations, and be in harmony with the environment & local community.

Huge Potential Resources
To-date, 10 main gold mineralized prospects and a quartz porphyry prospect have been defined by the exploration conducted in the Ciemas Gold Project area. Numerous gold occurrences are scattered throughout the 3078.5 ha area of the Ciemas Gold Project. This huge potential for further exploration on new mineral resources will pave the way to a sustainable future.

Out of these prospects, only 6 of them have been explored to have resources estimation as reported in the Independent Qualified Person’s Report (in accordance with the JORC 2012).  Wilton Makmur Indonesia SQMI


September 2013

Independent Qualified Person’s Report For The Ciemas Gold Project

An independent consultant, SRK Consulting China Limited (“SRK”) has prepared an independent qualified person’s report (“IQPR”) on the Ciemas Gold Project in West Java, Indonesia.

Wilton operates the Ciemas Gold Project in West Java, Indonesia with two mining licences covering a total area of approximately 30.8 square kilometres. The Ciemas Project consists of a number of gold deposit and occurrences. The gold mineralization in Ciemas is hosted in quartz veins, structural altered rocks with tectonic breccia, or in quartz porphyry.

SRK estimated that, at a gold cut-off grade of 1.0 g/t, the Pasir Manggu, Cikadu, Sekolah and Cibatu Prospects contain approximately 2.416 million tonnes (“Mt”) of Measured + Indicated Resources with an average grade of 8.44 g/t of gold., and 1.937 Mt of Inferred Resources with an average grade of 8.36 g/t of gold, reported in accordance with the Joint Ore Reserves Committee (“JORC”) code.

SRK also estimated that, at a gold cut-off grade of 1.69 g/t, the Pasir Manggu, Cikadu, Sekolah and Cibatu Prospects contain approximately 2.4405 Mt of Proved + Probable Reserves with an average grade of 7.1 g/t of gold, reported in accordance with the Joint Ore Reserves Committee (“JORC”) code.


June

Topography Mapping By LIDAR

Lidar (Light Detection & Ranging) airborne survey was flown over the entire 3,078 ha of our tenement producing detailed topography mapping data that would facilitate exploration activities, mining activities, processing plant, Tailings Storage Facility, waste dumps and infrastructure design. These software tools have been used extensively on our design work.

30 DDH Drilling For Metallurgical Testwork

Thirty diamond drill hole drilling were used to obtained oriented and intact rock coring samples from hundreds of metres below the ground across the four prospects area. These representative coring samples were used for the metallurgical test works

Open Cut Scoping Study

The open cut scoping study was to examine the viability of developing the Ciemas Gold Project by open cut methods followed by underground mining at depth. The study suggested that open cut mining provides a better financial outcome compared with underground mining of the upper zones of the deposit, adverse ground conditions and ground water are better managed, and mining risk are reduced. The downside to open cut mining is the increase in land disturbance.


August 2014

Mineral Resources Statement For The 4 Prospects

SRK completed the “Updated Resource Report for the Ciemas Gold Project” as of 30 June 2014. The Mineral Resources were reported in accordance with the Australasian Code of Reporting Exploration Results, Mineral Resources and Ore Reserves (the “JORC Code”, 2012 Edition). The Mineral Resources were updated for four advanced prospect zones, namely Pasir Manggu, Cikadu, Sekolah and Cibatu, among a number of mineralised zones. The Measured + Indicated Resources is 3,040 thousand tonnes (“kt”), contains 26,740 kg of gold with an average gold grade of 8.8 g/t. The Inferred Resources is 1,600 kt, contains 12,230 kg of gold with an average grade of 7.6 g/t Au.


October 2015

Process Plant, TSF & Waste Dumps Sterilization

The geophysical induced polarization & resistivity subsurface investigation study was to locate any anomalies (potential mineralization zone) beneath the surface area under investigation. The proposed major infrastructures (process plant, tailing storage facility and waste dumps) have been sterilized and hence ensuring no potential mineralization beneath it.


March

Mining Engineering Design

Preliminary Mining Engineering design for an open cut mining and underground mining have been completed. An open cut mining followed by underground mining has been proposed for the 4 prospects, While an underground mining design is proposed for the Cibak & cipancar prospects using adits, ramps and shafts, and adopting mining and prospecting methods simultanerously. The order of the underground mining is from hanging wall to footwall, and from top to bottom.

March

Tailings Storage Facility Engineering Design

Tailings Storage Facility (TSF) is used to store the tailings from the processing plant. The designs completed include natural site selection, embankment, decant & water return system, tailings delivery and distribution system. The TSF is designed situating at a natural valley, northeast from the designed process plant.

March

Metallurgical Test Work

The Metallurgical Test Work is to analyse the chemical and physical characteristics of the gold ore, and to find the optimum process flow route to extract the gold from its ore. The Test Work completed includes ore characterisation, response & optimization tests, oxidation option and comminution tests.


August 2016


Processing Plant Engineering Design

Following the Metallurgical Test Work, The Processing Plant Engineering Design including Capital Expenditure and Operating Expenditure was completed. The processing plant engineering design used primary crushing, SAG milling, gravity separation, froth flotation, two-stage fluid-bed roasting, off- gas scrubbing, carbon-in-leach, elution & regeneration, gold room and detoxification circuits, capable of treating ore at throughput rate of 0.5 million tonne per annum.

Geotechnical Investigation

Geotechnical investigation was completed by Golder Associates. It was to assess likely geotechnical and hydrogeological issues and design constraints (including embankment stability, foundations and potential impoundment issues) associated with the planned developments on the Tailing Storage Facility (TSF) and Process Plant. 

August 2017

Ciemas Gold Project – First Gold Pour

The first gold pour from the initial 500 tonnes batch ores of leaching and processing which commenced in June 2017 has produced 936 grams of gold with 99.0% purity.


July

Ciemas Gold Project – First Gold Pour

The first gold pour from the initial 500 tonnes batch ores of leaching and processing which commenced in June 2017 has produced 936 grams of gold with 99.0% purity.

Ciemas Gold Project Update Near-Term Production Of Gold

Construction of the first leaching processing plant and its associated supporting infrastructure commenced in early 2017 and is now complete. The first batch of leaching commenced in June 2017. The Leaching plant was designed to treat up to 1,000 tonnes of oxide ore per cycle. It includes crushers, a carbon absorption circuit and a smelter from which gold will be produced. Infrastructure includes steel structure housing, hauling road, power supply, laboratory, mess, etc.  Wilton Makmur Indonesia SQMI


Sustainability

Environmental Protection
On 22 October 2013, the company has been awarded “Clean and Clear” certificate by the Directorate General of Minerals and Coal. This certifies that the company has fully complied to the relevant Indonesian environmental and mining laws & regulations in conducting the mining operations.

Corporate Social Responsibility (“CSR”)
The Group has developed good working relationship, and has engaged, supported and provided employment for the local community. This invariably also improves the living standard of the community.

Through the CSR program, the Group has improved the infrastructure in the vicinity of the Concession Blocks, such as constructing public recreational facilities for the local community.

These cordial working relationships with the local community achieved through carrying out the mining activities responsibly would optimise the efficiency of the mining operations, and be in harmony with the environment & local community.

Huge Potential Resources
To-date, 10 main gold mineralized prospects and a quartz porphyry prospect have been defined by the exploration conducted in the Ciemas Gold Project area. Numerous gold occurrences are scattered throughout the 3078.5 ha area of the Ciemas Gold Project. This huge potential for further exploration on new mineral resources will pave the way to a sustainable future.

Out of these prospects, only 6 of them have been explored to have resources estimation as reported in the Independent Qualified Person’s Report (in accordance with the JORC 2012).  Wilton Makmur Indonesia SQMI