Cikarang Listrindo POWR


 








About 45 km southeast of Jakarta, starting in 1992, Cikarang Listrindo began the building of its first power plant in the heart of Jababeka Industrial Estate and since then has set the pace for industrial development by providing its customers with a high quality supply of electricity. More than 2,350 customers in 5 industrial estates trust Cikarang Listrindo to deliver reliable and stable power.



Among those customers are national and international/multinational manufacturers in such sectors as automobiles, electronics, plastics, food and chemicals. They include blue-chip corporations such as PT Astra Honda Motor, PT Mattel Indonesia, PT Omron Manufacturing of Indonesia, PT Komatsu Undercarriage Indonesia, PT Mayora Indah, PT Aisin Indonesia, PT Yanmar Indonesia, PT AJE Indonesia, PT Mitsubishi Electric Automotive, PT Enkei Indonesia, PT Jotun Indonesia, PT Kao Indonesia, PT Kansai Paint Indonesia, PT Kayaba Indonesia and PT Showa Indonesia Manufacturing along with many leading national companies.



To meet the industrial customers’ growing demand and to have a more reliable electricity supply system, Cikarang Listrindo continually invests to increase the plant capacity such as in 2015, when Cikarang Listrindo started operation of its additional power plant capacity of 109 MW in Megalopolis Manunggal 2100 Industrial Town. With the further addition of a 2×140 MW Coal-Fired Power Plant at Babelan in 2017, Cikarang Listrindo reached a combined plant capacity of 1,144 MW. An expansion program to raise available power up to 1,144 MW is in progress. Besides satisfying the demand of its industrial customers the company exports power to the national electricity grid of PLN. The company is committed to providing all its customers with the highest level of service in meeting their needs for stable and reliable power. Seamless and smooth supply of electricity gives customers a significant advantage in their operations and affords a level of reliability unsurpassed in Indonesia’s energy market.



Cikarang Listrindo is well known for giving complete and continuing customer satisfaction. Cikarang Listrindo POWR


Vision
Our Vision is to become a world-class power producer.

Mission
Our Mission is to excel in the electricity supply industry with good teamwork to meet our Customers’ needs for safe, reliable, clean and efficient power in a friendly and professional manner.

Corporate Values
The Company’s employees uphold integrity in performing their duties and believe in the following values :

Service

  • Helping others
  • Caring
  • Sincerity


Trustworthiness
  • Mutual respect
  • Engagement
  • Synergy
  • Honesty
Accountability
  • Commitment
  • Totality
  • Walk the talk
  • Responsibility


Reliability

1992
One of the first steps in the development of our first plant was to build the 150 kV switchyard which interconnects the power plant with the national electricity grid, the Java-Bali system.
1993
The first two GE Frame 6 gas turbines were installed in 1993 and provided a plant capacity of 60 MW.
1996
In 1996 the company added another four GE Frame 6 gas turbines and increased the capacity to 180MW.
1998
In 1998 Cikarang Listrindo added two Mitsubishi steam turbines, each capable of delivering 60 MW. By building two combined-cycle blocks, each consisting of three gas turbines, three heat recovery steam generators and one steam turbine, the total capacity reached 300 MW.
2000
In 2000 Cikarang Listrindo was awarded ISO 9001 Quality Management System certification.
2006
In 2006 a GE Frame 9 gas turbine was added, delivering 109 MW and increasing the plant total capacity to 409 MW.
2009
After adding another GE Frame 9 gas turbine in 2009, Cikarang Listrindo was able to produce a total capacity of 518 MW: another milestone in utilizing superior technology and providing customers with world-class quality power supply.
2011
In 2011 Cikarang Listrindo added two Alstom heat recovery steam generators and one Siemens 128 MW steam turbine to operate in combined-cycle mode with the two GE Frame 9 gas turbines and bring the plant capacity to 646 MW.
2012
12 the addition of a third GE Frame 9 gas turbine increased the available power to 755 MW.
2014
In 2014 Cikarang Listrindo was awarded ISO 14001 Environment Management System and OHSAS 18001 Health and Safety Management System certification.
2015
In 2015 a second power plant, which is located in Megalopolis Manunggal 2100 Industrial Town, delivered a plant capacity of 109 MW. This raised the total capacity of the two interconnected plants to 864 MW.
2016
In 2016 Cikarang Listrindo completed a US$272 million IPO on the IDX. Moreover, the Company achieved a record-breaking high of 1 million KVA contracted capacity in the same year.
2017
In 2017 the coal-fired power plant in Babelan was installed with two Valmet (circulating fluidized bed) boilers and two Siemens steam turbines delivering a plant capacity of 280 MW, and increasing the total capacity of the three interconnected plants to 1,144 MW. The coal-fired power plant in Babelan is connected to the 150kV transmission line of over 30km. Cikarang Listrindo POWR


Cikarang Listrindo is committed to the ongoing implementation of good corporate governance (GCG). The Company’s Code of Good Corporate Governance is intended as a foundation and guideline in managing the Company.
The principles of GCG are implemented pursuant to the Law No. 40 of 2007 on Limited Liability Corporations, Law No. 8 of 1995 on Capital Markets, the Company’s Articles of Association, regulations of the Indonesian Financial Services Authority (OJK – Otoritas Jasa Keuangan, previously known as Bapepam and LK), regulations of the Indonesia Stock Exchange (IDX), other prevailing laws and regulations and GCG principles covering transparency, accountability, responsibility, independence and fairness.
Cikarang Listrindo has published documents supporting the implementation of GCG such as a Code of Good Corporate Governance, a Board Manual and a Code of Conduct.

COMMITTEES

In performing its oversight duties, the Board of Commissioners is assisted by the following two Committees:
Audit Committee
The Audit Committee is established under a resolution of the Board of Commissioners of the Company to assist the Board professionally and independently to encourage the formation of an adequate internal supervisory body, improve transparency in financial reporting, review the scope of work and the appointment of the external auditor including but not limited to the fairness of the audit fee, experience, independence and objectivity, and implementation of the risk management and compliance level with the prevailing law and regulations.

Nomination and Remuneration Committee
The Nomination and Remuneration Committee is established under a resolution of the Board of Commissioners of the Company to carry out the functions and duties of the Board of Commissioners in relation to the nomination and remuneration of the Board of Directors and the Board of Commissioners. Cikarang Listrindo POWR

Quality

24 Hours

A customer hotline is open 24 hours a day manned by experienced members of staff who attend to all customers’ needs.

Security

The well-trained security team of Cikarang Listrindo takes care of all aspects in securing each plant and its transmission and distribution equipment. This is not restricted to the plant itself but includes outer areas in the neighborhood and involves the checking of sensitive facilities such as substations and other power installations.

Substation Maintenance

Every medium voltage customer has its own 20 kV substation. Cikarang Listrindo’s experienced service teams take care of monitoring and regular maintenance. Staff regularly attend seminars and training. The company’s service teams are always up to date with latest developments in testing, monitoring and analyzing technology of distribution systems and therefore are able to give a swift and professional response at all times.

Fire Trucks

In the power supply industry it is imperative to have a first class safety system. Safety is a key priority in all operations of Cikarang Listrindo. This includes a highly trained fire brigade. Being always prepared for any adverse circumstances is crucial. Cikarang Listrindo has its own fire trucks, which can also help out in cases of emergency in the surrounding area and the brigade carries out fire drills regularly.

Calibration of kWh Meters

In order to best serve its customers and to ensure precise billing statements Cikarang Listrindo has its own energy meter calibration department where all meters are carefully inspected and calibrated on a regular basis. Cikarang Listrindo POWR


Infrastructure

Main Control Room

The heart of the power plant is the main control room. All operations of the plant are continuously monitored. By utilizing state-of-the art equipment the engineers of Cikarang Listrindo ensure stable operation.

Distribution Control Centre/SCADA Room

In order to ensure that all customers receive steady power supply, the distribution of electricity is also continuously monitored from a Distribution Control Centre / SCADA Room. This is another key factor in the reliability of Cikarang Listrindo.

20kV Distribution Boards

After being stepped down from 150 to 20 kV the electricity supply is distributed to Cikarang Listrindo’s customers in all five industrial estates. Flawless performance is crucial and the status of distribution boards and systems is closely observed.
Additionally Cikarang Listrindo’s medium voltage customers have the privileged advantage of two incoming feeder lines: a normal and a stand-by supply line. This feature provides continuous power supply for its customers 24 hours a day 7 days a week.

Chemist Laboratory

Cikarang Listrindo makes its environmental responsibility one of its top priorities. Chemical engineers routinely analyze the quality of the cooling water. Clean water is imperative for smooth steam turbine operation and an important point in the company’s commitment to deliver clean energy both to serve its customers and maintain the environment.

Gas Compressors

Efficient performance of the gas-fired plants depends on steady gas supply and stable gas pressure for proper operation of the gas turbines. Cikarang Listrindo has installed three dedicated gas compressors in Jababeka Plant and another two in MM2100 Plant, to deliver the correct gas pressure to the gas turbines at all times. Cikarang Listrindo POWR


Environment 

Cikarang Listrindo views Health, Safety and Environment (HSE) as critical to all its employees and customers in all operations and the company is committed to continually improve its performance. The HSE policies are overseen by a board of directors which provides direction for the management of HSE and input on current and emerging health, safety and environmental issues such as:
  1. HSE Training
  2. Safe Working Practices
  3. Drugs and Alcohol Policy
  4. Smoking in the Workplace Policy


Cikarang Listrindo was recognized for its commitment to employee health and safety and was awarded OHSAS 18001 Occupational Health and Safety Management Systems certification in 2014. Cikarang Listrindo POWR
Head Office:
World Trade Centre 1, 17th Floor
Jl. Jend. Sudirman Kav. 29-31
Jakarta 12920, Indonesia 
Telphone (021) 5228122, 2522145
Facsimile (021) 5224440
Cikarang Listrindo POWR