Megapower Makmur established in 2007 engaged in the procurement of goods
and services for power generation. In 2010, Megapower Makmur had
acquired by Bina Puri Holdings Bhd and start investing through Power
plant in one of the Indonesia shortage of electricity area. In 2012,
Megapower Makmur totally has become an Indonesia IPP (Independent Power
Producer) Company. Megapower Makmur currently is a subsidiary of Bina
Puri Holdings Bhd, a public company listed on the main board of Bursa
Malaysia Berhad, with 40 years of work experience in the field of civil
construction and the building of both local and international. The
Group's business activities which include investment holdings, civil
engineering and building management, development and property
management, toll road concessions, mining, building materials industry,
and power plants. With the support and experience of Bina Puri Holdings
Bhd, Megapower Makmur believes becoming a public company with a healthy
performance, international standard and environmentally friendly.
Megapower Makmur MPOW
Vision
Being a public company with a healthy performance, international standards and environmentally friendly.
Mission
Doing business in the field of power generation and business development
that is friendly to the environment in order to ensure the existence
and development of the company long-term. Megapower Makmur MPOW
Hydro Power
Electrical conditions in Indonesia, especially for PT PLN (Persero) is currently faced with various problems such as:
a) The issue of availability of primary energy,
b) Availability of power is not balanced by the growth in electricity demand,
c) Dependence on oil and fuel prices are increasing expensive,
d) Electricity Cost (EC) remains high,
e) New electrification ratio reaches 54%,
f) Financial limitations PLN to build additional plants,
g) The selling price of electricity has not reached the economic value,
h) etc... Megapower Makmur MPOW
a) The issue of availability of primary energy,
b) Availability of power is not balanced by the growth in electricity demand,
c) Dependence on oil and fuel prices are increasing expensive,
d) Electricity Cost (EC) remains high,
e) New electrification ratio reaches 54%,
f) Financial limitations PLN to build additional plants,
g) The selling price of electricity has not reached the economic value,
h) etc... Megapower Makmur MPOW
As we know that the current EC outside Java, especially in eastern
Indonesia is still very high and this is because most of the plants
using the fuel.
By looking at the condition of the limited supply of electricity
(imbalance between supply and demand for electric power for household
use; business; social and industrial growth) will potentially occur at
the time of peak load outages due to lack of availability of electrical
power. Until now PT PLN (Persero) had difficulty to supply new
customers, especially for industrial and business customers.
To overcome the problems mentioned above have made efforts to find
and exploit new sources of renewable and alternative energy. One source
of renewable energy potential is water on the river for Minihidro Power
Plant (MHP). Potential Indonesia’s MHP is relatively abundant and are
scattered in various regions. On this occasion the PT. Megapower Makmur
proposed building MHP Bantaeng-1 on the river Bialo with 4200 kW
promised capacity (i.e.: 1 unit size 2100 kW and 1 unit size 2100 kW) in
Bantaeng district, South Sulawesi.
Diesel Power
Diesel Power Center (PLTD) fuel oil (diesel), typically used to meet
electricity needs in a number of small load, especially for new or
remote areas for rural electrification. In the development of the diesel
can also use gas fuel (BBG) The machine uses a diesel combustion
chamber where the explosions in the combustion chamber moving the piston
/ piston to the crankshaft which is then converted into rotary energy.
This rotary energy is used to turn a generator that transform them into
electrical energy. To improve the efficiency of air mixed with the fuel
pressure and the temperature is raised first to the turbo charger. The
turbo charger driven by the exhaust gases of combustion from the
combustion chamber.
The diesel engine used must be of high quality, performance and
durability of the best, with low fuel consumption which produces high
output, as well as light, vibration and low noise, so as not to cause
pollution of both air and sound (still being reasonable in legislation) Megapower Makmur MPOW
Solar Power
ndonesia has the gift of sunshine. Almost in every corner of Indonesia, the sun shone all morning until the afternoon. Energy emitted by the sun can be converted into electrical energy using solar cells panels.
Solar power generation is environmentally friendly, and very promising. As one alternative to replace power plants use steam (oil and coal).
The development of technology in making solar panels better than the level of efficiency, long-lasting battery manufacture, and manufacture of electronic devices that can use Direct Current.
At this time the use of solar energy (solar panels) is still considered expensive in the absence of subsidies. The electricity we use today is actually subsidized electricity. Imagine exploitation / mining kerosene, coal (damaging the environment), the manufacture of steam electric power generation, power distribution, all of which were built at great expense.
Excess Solar Power:
• Renewable Energy / never run out
• Clean, environmentally friendly
• Age-term solar cell panel / long-term investment
• Practically, it does not require treatment
• It is suitable for tropical regions such as Indonesia
Solar panels as an important component of a solar power plant, turning sunlight into electricity. Generally we calculate the maximum sunlight converted into electricity throughout the day is 5 hours. Electric power in the morning - afternoon is stored in the battery, so that electricity can be used at night, where no sunlight.
Solar Power Generation Plan
Since solar power is dependent upon sunlight, so good planning is necessary. Planning consists of:
- The amount of energy needed for daily use (Watt).
- How large is the current produced solar cells panel (Ampere hour), in this case calculate how many solar panels to be installed.
- How many units of batteries required for the desired capacity and consideration use without sunlight. (Ampere hour).
In
value to the economy, solar power has a higher value, where the power
of the PT. PLN is not enabled, or the installation of petrol or diesel
power generators. For example, remote areas: mining, farming, fishing,
remote villages, etc.. In terms of long term value to the economy is
also high, due to good planning, solar power with solar panels have the
endurance 20-25 years. Battery and some other components with durability
3-5 years.
Components of Solar Power Generation
For the installation of solar power as a power plant, required components as follows:
1. Solar panel
2. Charge controller
3. Inverter
4. Battery
Components of Solar Power Generation
For the installation of solar power as a power plant, required components as follows:
1. Solar panel
2. Charge controller
3. Inverter
4. Battery
Solar panels convert solar energy into electricity. Silicon cells (also called solar cells) are exposed to the sun / solar, making photons that produces an electric current. A solar cells produce less voltage 0.5 Volt. So a 12-volt solar panels made up of approximately 36 cells (to produce 17 volts maximum voltage).
Charge controller, is used to regulate the charging arrangements. Maximum voltage produced solar cells in the summertime panels will produce high voltage which can damage the battery.
Inverters, are electrical devices that convert the direct voltage (DC - direct current) into alternating voltage (AC - alternating current).
Battery, is a chemical device to store electricity from solar power. Without batteries, solar energy can be used only when there is sunlight. Megapower Makmur MPOW
OPERATION & MAINTENANCE
Our diesel power plant Operation and Maintenance (O&M) services
are providing nearly complete package. In addition to commercial
operating, maintaining and repairing the power plant (together with
Komatsu Representative in Indonesia), we offer technical support and can
manage and train the plant personnel. Our experience covers power plant
installation and commissioning as well as commercial operation,
maintenance and potential rental engine.
Today our diesel power plant service includes installation &
commissioning, maintenance & O&M. We apply experience gained in
one service area to improve other services and set a new standard for
customer satisfaction
Operation Services
Our efforts continue so that Engine may emerge as the recognize
diesel power plant Operation, both quantitatively and qualitatively.
Maintenance Services
Our preventative maintenance services cover the engine, generator and
balance of plant (BOP) systems. They are conducted according to a
regular schedule as well as on the basis of operational hours to ensure
maximum plant reliability and avoid unscheduled shutdowns.
Installation & Commissioning Services
During the initial construction or plant expansion work, we inspect
carefully to identify potential problems (performance irregularities,
shutdowns and quality defects) and correct them prior to startup.
Each system is installed and test operated, and the overall plant is
performance tested to ensure that everything is in peak working
condition at the time commercial operation begins. Megapower Makmur MPOW
Head Office
Galeri Niaga Mediterania 2 Blok M8 I - J,Jalan Pantai Indah Utara 2,
Pantai Indah Kapuk,
Jakarta Utara, 14460, Indonesia
Telephone: +6221 5883595
Facsimile: +6221 5883594
E-Mail: info@megapowermakmur.co.id
Megapower Makmur MPOW